Product details
| Cone angle side 1 | 24 ° |
|---|---|
| Cone angle side 2 | 24 ° |
| Connection 1, thread diameter | M22 |
| Connection 1, thread pitch | 1.50 mm |
| Connection 1, thread type | Metric |
| Connection 1, type | Swivel nut |
| Connection 1, type - male/female | Female |
| Connection 2, thread diameter | M26 |
| Connection 2, thread pitch | 1.50 mm |
| Connection 2, thread type | Metric |
| Connection 2, type | Thread |
| Connection 2, type - male/female | Male |
| D1Connection no 1 diameter | 14 mm |
| D2Connection 2, diameter | 18 mm |
| DIN standard | 2401 |
| Includes | Body, Swivel nuts, Sealing cone with O-ring |
| LTotal length | 44 mm |
| Max working pressure | 315 BAR |
| Pros | Reduced risk of leakage |
| Series connection 1 | 18L |
| Series connection 2 | 18L |
| Shape | Straight |
| Surface treatment | Zinc, Nickel-plated |
| Unit | Each |
Logistics
| EAN | — |
|---|---|
| Unit of measure | EA |
| Weight | 140 g |
| Dimensions | 45 × 35 × 35 mm |
| Dangerous goods | No |
You might also like
BPA000301237
Dietzel Coupling 6S 6L KOVO6S6L
£14.58 excl.
£17.50 incl.
Backorder available
Usually ships within 3–8 weeks
BPA000287581
Dietzel Coupling 18L 18L GVO18L18L
£12.33 excl.
£14.80 incl.
In stock
Expected to ship on Wednesday 23 September
BPA000388563
Dietzel Adaptor M/F 1 ORFS VNOW16
£48.08 excl.
£57.70 incl.
In stock
Expected to ship on Tuesday 22 September
BPA000287583
Dietzel Coupling 18L 20S GVO18L20S
£16.48 excl.
£19.78 incl.
In stock
Expected to ship on Thursday 24 September
BPA000342659
Dietzel Swage coupling DN13-M24x1.5-16S-180°-1 PS1316180180
£44.65 excl.
£53.58 incl.
In stock
Expected to ship on Tuesday 22 September
BPA000301218
Dietzel Coupling 28L 38S KOVO28L38S
£48.25 excl.
£57.90 incl.
Backorder available
Usually ships within 3–8 weeks
Recently viewed
BPA000301225
Dietzel Coupling 35L 42L KOVO35L42L
£72.91 excl.
£87.49 incl.
In stock
Expected to ship on Thursday 24 September
BPA000301229
Dietzel Coupling 6L 10L KOVO6L10L
£8.54 excl.
£10.25 incl.
Backorder available
Usually ships within 3–8 weeks
